Horizon of 2014 EREC ُ S generation, transmission and sub - transmission network development plan

Based on studies and Impartation of Tavanir CO., and also with regard to EREC's load growth projection of about 6.2% per year; EREC plans to have the following capacities ready by 2014 to fulfill the needs of its growth in the region.

 

 

Generation

capacity

Mw

Transmission

Substations Capacity

MVA

Sub-transmission

Substations Capacity

MVA
2009

Present

installation
3962
7536
6066
 

 

2014
New construction
3000
5050
2520

Development

Of installation
477
1270
590
 

TOTAL

7439
13856
9176
  • Some Special projects that will be utilized for the first time in the Esfahan region by 2014 are as follows:
  1. Taleghani 230/63 kv GIS(Gas Insulation Substation)
  2. Sofeh 230/63 kv GIS
  3. Shoohada 63/20 kv GIS
  4. Mobarezan 63/20 kv GIS
  5. Chamran 63/20 kv GIS
  6. Construction of 13 Km underground Tunnel to pass 230 and 63 kv underground cable.
  7. Construction of new combined cycle power plants.
  • Construction of Power Plants:
  1. Kashan power plant 500MW
  2. Ardestan power plant 500MW
  3. Shargh Esfahan power plant 1000MW
  4. Lordegan power plant 500MW
  5. Distributed Generation about 500MW
  • Construction of Transmission Substations:
  1. Shamal Shargh 400/63 KV
  2. Lordegan 400/63 KV
  3. Daran 400/63 KV
  4. Shargh Esfahan 400/63 KV
  5. Kohandezh 230/63 KV
  6. Ghaem Kashan 230/63 KV
  7. Mahyar 230/63 KV
  8. 25 (AIS) Substations 63 KV
  9.  