EREC in Brief -September 2012
|
Quantity
|
Unit
|
Description
|
Generation
|
Opeartional Capacity
|
830
|
MW
|
Esfahan Power Plant
|
1540
|
MW
|
Montazery Power Plant
|
42
|
MW
|
Hesa Power Plant
|
2433
|
MW
|
Total Power Plant
|
Transmission and Sub-Transmission
|
Length of Transmission and Sub-Transmission Overhead Lines
|
1885/6
|
Km-Circuit
|
400 KV Lines
|
1411
|
Km-Circuit
|
230 KV Lines
|
5774/1
|
Km-Circuit
|
63 KV Lines
|
72/8
|
Km-Circuit
|
63 KV Under ground cable
|
9143/6
|
Km-Circuit
|
Total Length
|
2125
|
KM
|
Length of OPGW
|
Number of Substation at Transmission and Sub-Transmission
|
8
|
NO.
|
400 KV Substations
|
14
|
NO.
|
230 KV Substations
|
140
|
NO.
|
63 KV Substations
|
176
|
NO.
|
Total
|
Capacity of Transmission and Sub-Transmission substations
|
4280
|
MVA
|
400 KV Substations
|
4335
|
MVA
|
230 KV Substations
|
7071
|
MVA
|
63 KV Substations
|
15686
|
MVA
|
Total Capacity
|